Student Housing

DESCRIPTION

Execution of 57 government subsidised homes for the university community. The building, on the same block as the Escola d’Arquitectura del Vallès or Vallès School of Architecture, is organised using two parallel linear blocks forming an atrium or interior patio that, in a second phase, is expected to be covered, providing the building with a heat recovery system and a space for common uses.

Download PDF profile

BUILDING STATUS

Project: 15/12/2009
Construction: 9 months
Production: 42 days