Primary&Secondary School

DESCRIPTION

Construction of high school building between the existing primary building and the sports court. It is a eMii-CS building, with a ground floor single volume and two floors, parallel to the street. It is a double porch school with a central corridor. It has 2 staircases, an outer staircase that gives access to the track and a perimeter porch from the entrance leading to a ramp area to the existing courtyards. It includes library, workshop room and laboratory, plus classrooms, special classrooms and administration areas. Interior finishes are in exposed wood, plasterboard, ceramic tile in bathrooms and pvc pavement, sandwich panel façades, Atenea sheet and metal sheet finishes.

Institut escola Montagut planol, CompactHabit

Download PDF profile

BUILDING STATUS

Project: April 2019
Construction: 7 months
Production: 11 weeks