To deal with the COVID-19 health emergency, the Catalan Health Service (Catsalut) awarded Constructora d’Aro the design and construction of the new multipurpose hospital space at the Arnau de Vilanova hospital in Lleida. The project, which consists of PB+3, is designed using 63 eMii-Cs system industrialized modules manufactured at the Cardona production center. The building has almost a 4,500m2 of floor space and 90 beds. To construct the building in 4.5 months, an advanced work organization method called Lean Construction was used, collaborating with a group of expert consultants in this field.

Download PDF profile

BUILDING STATUS

Project: 10/09/2020
Construction: 20 weeks