Dow Chemical security office

DESCRIPTION

Entrance security office at the contractor’s facilities of DOW Chemical. It is composed of two CH modules arranged in ground floor. The interior space includes a reception area with two tables, a lobby and a bathroom.

Download PDF profile

BUILDING STATUS

Project: 20/5/2013
Construction: 1 month
Production: 20 days