Primary&Secondary School

DESCRIPTION

Ground floor + 2 building industrialized module construction on a plot belonging to Antaviana school, annex to the existing building.  There are two stairs, elevator, toilet area and several classrooms per square-shaped floor.

Download PDF profile

BUILDING STATUS

Project: Juin 2018
Construction: 3 months
Production: 4 weeks