Semi-dettached Housing

DESCRIPTION

Development of 6 industrialized semi-dettached houses. The building is organised from a lineal block with a conventional construction ground floor aimed to be used as a parking area and two more modular floors to be used as living space. Ground floor houses a hall, an open-plan a kitchen-dining room,  toilet, and the space under the stairs used as installation and storage area.  First floor houses the main bathroom , hallway and two bedrooms.

Download PDF profile

BUILDING STATUS

Project: March 2018
Construction: 7 months
Production: 15 weeks